Metal supports for the elevator system are being installed in the elevator shafts.
|
The original stairway has been completely removed and replaced with a modern stairway on the other end of the building.
|
Stairwell B is complete and open for use.
|
|
Drywall installation has begun on lower floors.
|
Future OB/GYN Nurse's Station on the second floor.
|
A view of window replacement on the back wing of 161 Jackson Street.
|
|
The city has made improvements to the parkway in front of 161 Jackson Street.
|
Trees and shrubbery have been planted in front of the newly expanded Metta Health Center.
|
|